Skip to content
TurkStatProduction and confidence

Turkey construction output

Construction production index (annual change, calendar adjusted) · Turkish Statistical Institute

Short answer

−6.3%

September 2026 −8.6 pp

According to TurkStat, the construction production index changed by −6.3% in September 2026 compared with the same month of the previous year. That is down 8.6 percentage points from the previous month.

  • This is the lowest value in the last 24 months.
  • A year earlier (September 2025) it was 20.7%; the latest value is 27.0 percentage points lower.

Next release: Tuesday 15 December 2026, 10:00

Data table

All values in the chart, newest first. Unit: %.

PeriodConstruction output (%)Change vs previous period
September 2026−6.3−8.6 pp
August 20262.3+6.8 pp
July 2026−4.5+1.2 pp
June 2026−5.7−2.5 pp
May 2026−3.2−5.1 pp
April 20261.9+3.0 pp
March 2026−1.1−6.8 pp
February 20265.7−2.1 pp
January 20267.8+0.3 pp
December 20257.5−6.0 pp
November 202513.5−5.6 pp
October 202519.1−1.6 pp
September 202520.7+4.5 pp
August 202516.2+0.8 pp
July 202515.4−1.0 pp
June 202516.4+4.2 pp
May 202512.2+9.8 pp
April 20252.4−1.7 pp
March 20254.1−2.0 pp
February 20256.1−2.6 pp
January 20258.7−2.2 pp
December 202410.9+3.5 pp
November 20247.4+4.1 pp
October 20243.3−4.7 pp
September 20248.0+0.2 pp
August 20247.8−1.0 pp
July 20248.8+5.4 pp
June 20243.4−1.8 pp
May 20245.2−8.0 pp
April 202413.2−4.9 pp
March 202418.1−6.1 pp
February 202424.2+6.9 pp
January 202417.3+7.0 pp
December 202310.3+1.6 pp
November 20238.7−0.5 pp
October 20239.2−3.5 pp
September 202312.7+7.3 pp
August 20235.4−4.0 pp
July 20239.4+2.1 pp
June 20237.3+1.9 pp
May 20235.4+1.9 pp
April 20233.5−6.6 pp
March 202310.1+5.1 pp
February 20235.0+1.1 pp
January 20233.9+8.5 pp
December 2022−4.6+6.2 pp
November 2022−10.8+0.9 pp
October 2022−11.7+3.1 pp
September 2022−14.8−6.5 pp
August 2022−8.3−1.1 pp
July 2022−7.2−8.9 pp
June 20221.7+1.0 pp
May 20220.7+0.7 pp
April 20220.0+5.7 pp
March 2022−5.7+3.1 pp
February 2022−8.8−2.4 pp
January 2022−6.4−0.4 pp
December 2021−6.0−4.0 pp
November 2021−2.0−1.6 pp
October 2021−0.4+3.2 pp
September 2021−3.6+3.5 pp
August 2021−7.1−5.1 pp
July 2021−2.0−9.2 pp
June 20217.2−5.4 pp
May 202112.6+0.6 pp
April 202112.0+8.9 pp
March 20213.1+3.3 pp
February 2021−0.2+3.0 pp
January 2021−3.2−4.2 pp
December 20201.0−1.1 pp
November 20202.1−3.2 pp
October 20205.3−0.1 pp
September 20205.4−2.4 pp
August 20207.8+9.7 pp
July 2020−1.9+13.1 pp
June 2020−15.0+5.4 pp
May 2020−20.4−0.9 pp
April 2020−19.5−5.1 pp
March 2020−14.4−3.4 pp
February 2020−11.0+0.3 pp
January 2020−11.3−28.0 pp
December 201916.7+6.6 pp
November 201910.1+6.0 pp
October 20194.1+8.1 pp
September 2019−4.0+8.1 pp
August 2019−12.1+3.9 pp
July 2019−16.0+2.6 pp
June 2019−18.6−1.1 pp
May 2019−17.5−0.8 pp
April 2019−16.7−1.0 pp
March 2019−15.7+0.5 pp
February 2019−16.2−1.1 pp
January 2019−15.1+12.2 pp
December 2018−27.3−3.4 pp
November 2018−23.9−0.5 pp
October 2018−23.4−4.8 pp
September 2018−18.6−10.0 pp
August 2018−8.6−6.5 pp
July 2018−2.1−4.4 pp
June 20182.3−5.5 pp
May 20187.8−5.9 pp
April 201813.7−7.7 pp
March 201821.4−13.2 pp
February 201834.6−7.1 pp
January 201841.7

Related indicators

Production and confidence

What does this indicator measure?

In TurkStat's definition, the construction production index measures the change in the volume of output in construction of buildings, civil engineering and specialised construction activities, through the material and labor inputs used in these sectors. The reference year is 2021=100.

According to TurkStat's metadata, material input is calculated from Form BA-BS and e-invoice records from the Revenue Administration, and labor input from the Social Security Institution's monthly premium and service documents.

The rate on this page is the annual change used in TurkStat's headline: for total construction (NACE Rev.2 F), the change in the calendar adjusted index compared with the same month of the previous year. The series is taken from the bulletin table from 2018 onward.

How to read it

  • In the same bulletin TurkStat also publishes separate rates for construction of buildings, civil engineering and specialised construction activities; sub-sectors can move in a different direction from the total.
  • TurkStat calculates the monthly change with the seasonally and calendar adjusted index against the previous month.

Common misreadings

  • The construction production index does not measure construction costs; for cost changes see TurkStat's construction cost index.
  • The index does not show house sales or the number of building permits; it measures the volume of construction activity.
  • Values for earlier months can be revised in later bulletins.

Frequently asked questions

How much did construction output change in Turkey?

According to TurkStat, the construction production index changed by −6.3% in September 2026 compared with the same month of the previous year. In the previous month (August 2026) the rate was 2.3%.

When will the construction production index be released?

According to TurkStat's release calendar, the next Index of Production in Construction bulletin will be published on Tuesday 15 December 2026, 10:00.

What is the difference between the construction production and construction cost indices?

The production index measures the change in the volume of construction activity, while the cost index measures price changes in material and labor costs.

Which activities does it cover?

Under NACE Rev.2: construction of buildings (41), civil engineering (42) and specialised construction activities (43).